TCC Security Systems - RFP-TC1017

The Tri-County Council for the Lower Eastern Shore of Maryland (TCC) is renovating a 76,000 square foot facility and erecting a maintenance facility on a 26 acre campus in Salisbury Maryland.  TCC is issuing this RFP for the installation and configuration of a comprehensive security system. This system will include an Alarm system, CCTV system and Access Control System.


 

Facility Location: 31901 Tri-County Way, Salisbury, MD 21804.  The road was renamed from Comtek Lane earlier this year.  The facility is located across Rt. 50 from Wor-Wic Community College and west of Walston Switch Road.

 

**The Security System RFP has been awarded to ARK Systems, Inc.**

 
Lead Contacts

 

TCC Project Manager

John Donegan
Office: 410-632-3300
Cell: 443-783-0723
Fax: 410-632-1466

   
     
     
     
 
Dates and Timelines
Date/Time Activity Description
   
   
   
   
   
   
   
   
   
   
   
   
   
   
   

 

 
RFP Documents
FilenameUpload DateModified DateFile Size
Access Control Door Hardware Schedule.xls9/10/2015 5:07:50 PM9/22/2011 9:38:54 AM53 k
Camera Hardware Schedule.xls9/10/2015 5:07:50 PM9/22/2011 1:02:29 PM31 k
Power To Doors with Electronic Latch Retraction.pdf9/10/2015 5:07:50 PM9/29/2011 2:43:16 PM1,383 k
Security prebid sign in sheet.pdf9/10/2015 5:07:51 PM10/13/2011 12:34:49 PM226 k
TCC-RFP-TC1017 - Security Floor Plans.dwf9/10/2015 5:07:51 PM11/2/2011 12:52:33 PM18,955 k
TCC-RFP-TC1017 - Security Floor Plans.pdf9/10/2015 5:07:56 PM9/22/2011 1:01:22 PM4,051 k
TCC-RFP-TC1017 - Security System v0.2_final.pdf9/10/2015 5:07:57 PM9/22/2011 12:55:23 PM146 k
Thumbs.db9/10/2015 5:07:57 PM10/13/2011 12:35:49 PM52 k

 
FAQs

Are we to supply lock power supplies for all locks furnish by other?

All locks that need special power supplies will already be provided.  All other locks will be powered through the low voltage of the access control system.  TCC suggests centralized power distribution from the 1st floor server room where the system can be connected (plugged in) to power from the generator panel.  If the bidder wishes to do distributed low voltage power from various location throughout the building they are required to run 120VAC power from the generator panel in the server room to these locations.  Approximately five (5) exterior doors have been fitted with strikes that require 120VAC power.  TCC has had its construction electrician run this power to these doors.  All Mag-Lock doors will have power, request to exit and be connected to the fire alarm system by the construction electrician under a separate contract.

 

   
 